Solar panels and home batteries: your questions answered
Getting solar panels installed: from survey to switch-on
In short: after a survey and a quote, installation usually takes one to two days, and up to four for bigger systems of more than 14 panels. Your network operator must be told, and you should get a commissioning certificate, an MCS certificate and a building regulations certificate.
Figures checked on 18 November 2026.
Before the work
What happens at a solar survey?
The installer checks your roof's direction, angle, condition and shade, and where the inverter and any battery can go. That's what their price and generation estimate should be based on.
How many quotes should I get?
Get at least three quotes, from different installers (Energy Saving Trust). How to compare them is on the cost page.
How much deposit should I pay?
No more than 25 per cent of the full cost (Energy Saving Trust).
Do I need planning permission for solar panels?
Usually not, for panels on a house roof. In England, roof panels are generally permitted development if they stick out no more than 200mm from the roof slope and don't go above the highest part of the roof (not counting the chimney). There are extra limits in conservation areas and for listed buildings, and new rules started on 27 August 2026 (Planning Portal). Your installer or council can confirm for your home.
Do I need to tell my home insurer?
The Energy Saving Trust advises checking that your home insurance covers the changes to your home.
Installation
How long does it take to install solar panels?
Usually one to two days, and up to four for bigger systems of more than 14 panels (The Eco Experts, October 2026). Scaffolding typically adds £300 to £1,200 to the price.
What happens on installation day?
Scaffolding goes up, the panels are fixed to the roof, the inverter and any battery are fitted, and everything is wired into your electrics. The installer then tests the system and switches it on.
After switch-on
Does the electricity network need to know?
Yes. For most home systems, up to 3.68 kW per phase, your network operator must be told within 28 days of switch-on, using form G98. Check your installer is sending it for you. Larger systems need approval before they're connected (G99).
What paperwork should I get after installation?
- A commissioning certificate once the work is complete (Energy Saving Trust).
- An MCS installation certificate. The installer should register your system within 10 working days of finishing (Energy Saving Trust). Suppliers may ask for it before paying for your exports, and most schemes need it.
- A building regulations certificate of compliance from a registered installer (Energy Saving Trust).
- The manuals, and an explanation of how the system and its controls work (Energy Saving Trust).
- Your warranties, including the workmanship warranty and its insurance.
How do I start getting paid for the electricity I export?
Apply to a supplier that offers the Smart Export Guarantee. You'll need an MCS-certified system and installer, and a smart meter that records your export, and the supplier may ask for your MCS certificate (Energy Saving Trust).
More on the savings page.
Keeping it running
What maintenance do solar panels need?
Very little. Rain keeps panels clean if they're tilted at 15 degrees or more. Keep nearby trees trimmed to cut shading. Panels should last 25 years or more, and the inverter usually needs replacing after about 12 years. Your installer should leave written details of any maintenance checks (Energy Saving Trust).
Real installs on the record
Each links to its job page, with the photos.
Sources
- Energy Saving Trust, Installing renewable technology (8 June 2026), checked 18 November 2026
- Energy Saving Trust, Smart Export Guarantee, checked 18 November 2026
- Energy Saving Trust, Solar panels, checked 18 November 2026
- Planning Portal, Solar equipment mounted on a house, checked 18 November 2026
- SSEN, Installations up to 3.68kW per phase, checked 18 November 2026
- The Eco Experts, How much do solar panels cost in the UK? (MCS data, October 2026), checked 18 November 2026