16-panel DMEGC solar PV system with Hanchu ESS hybrid inverter and 9.4kWh battery storage, Mansfield
Energy On 24 completed a solar PV installation in Mansfield in November 2026.
Energy On 24 completed a full solar PV installation at a property in Mansfield in November 2026, supplying and fitting sixteen 470W DMEGC panels alongside a Hanchu ESS hybrid inverter and a 9.4kWh Hanchu battery unit.
Job details
| Completed | November 2026 |
|---|---|
| Location | Mansfield, Nottinghamshire, NG20 |
| Service | Solar PV installation |