18 x AIKO 540W panels with Sigenergy inverter and 16kWh battery storage, Ware
Energy On 24 completed a solar PV installation in Ware in November 2026.
Energy On 24 completed a solar PV installation at a detached house in Ware in November 2026, fitting 18 AIKO 540W panels alongside a Sigenergy 10kWh inverter and a Sigenergy battery system totalling 16kWh across two units. The installation also included a Sigenergy gateway, an Eddi diverter, and bird mesh, and the whole job was completed in a single day.
Job details
| Completed | November 2026 |
|---|---|
| Location | Ware, Hertfordshire, SG11 |
| Service | Solar PV installation |
| Guarantee given | 10 year warranty |
| Time on the job | One day |
| Property | Detached house |